Guangdong, China
Year of Establishment:
2009-12-28
Management System Certification:
ISO 9001
Export Year:
2008-03-04
Average Lead Time:
Peak season lead time: within 15 workdays
Off season lead time: within 15 workdays
OEM/ODM Availability:
Yes
OEM/ODM Service
Spanish Speaker

Scaffolding System, Cuplock Scaffolding Systems, Scaffolding Cuplock System manufacturer / supplier in China, offering Steel Cuplock Scaffolding System for Concrete Building Construction (Made in Guangzhou) (CS2500), China Factory Recycling Construction OEM and ODM Formwork System, Steel Metal Wall Formwork for Building and so on.

Gold Member Since 2011
Audited Supplier
Supplier Homepage Products Cuplock Scaffolding Steel Cuplock Scaffolding System for Concrete Building Construction (Made in Guangzhou) (CS2500)

Steel Cuplock Scaffolding System for Concrete Building Construction (Made in Guangzhou) (CS2500)

Get Latest Price
Min. Order: 3 Tons
Port: Huangpu, China
Production Capacity: 1000 Tons Per Day
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram, Cash
Material: Steel
Type: Mobile
Structural Style: Soffit Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Floor Type Scaffolding
Lapping Form: Full Scaffolding

You Might Also Like

Loading...

Basic Info

Model NO.
CS2500
Erection Position
External Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Color
Blue,Red,Grey,Silver etc
Technique
CO2 Arc Welded
Surface Treatment
Powder Coated,DIP Painted,HDG
Working Height
2.4m/Set
Working Life
5-7 Years
Loading Capacity
2 Tons /Set
Certification
SGS
Application
for Indoor and Outdoor Building Construction
Handle Material
Steel Pipes
Trademark
AJ Cuplock Scaffolding System
Transport Package
Cuplock Scaffolding Is in Bulk Package
Specification
SGS, EN12810
Origin
Guangzhou, China
HS Code
7308400000
Function of Steel Cuplock Scaffolding System:
1. Cuplock Scaffold is a kind of heavy duty scaffolding system with high bearing capacity.
2. A fixed bottom cup and a movable top cup can clamp ledger end securely and quickly.
3. Cuplock scaffold system is mainly used to building bridge project, supporting concrete walls, slab beams and temporary formworks in side building.

Structure of Steel Cuplock Scaffolding System:
1. Cuplock scaffold include standard, ledger, up cup, bottom cup and ledger blade.
2. One standard is welded a up cup and a bottom cup every 600mm to join ledgers at different heights.
3. One ledger is welded a ledger blade on both ends.
4. A sleeve base is welded at the bottom of standard to ensure stability on uneven ground and also use as the connector for the standard to connect together and get higher for both inside and outside the building.

Features of Steel Cuplock Scaffolding System:
1. Fast speed of installation, simple structure
2. High strength and durability
3. Longer working life
4. Low maintainance and easy transportation
5. Flexibility in use.
6. Modular scaffolding system
7. High loading capacity scaffolding
8. Durable and safe falsework for construction
9. No loose components.
10. Multi-functional in use.

Description of Steel Cuplock Scaffolding System:
1. Metal cuplock scaffolding system is a scaffolding system for construction which is easy to assemble and diamantle due to its structure is very simple

2. Steel cuplock scaffolding system is a heavy duty facade scaffolding system for the concrete building construction.

3. Construction scaffolding cuplock system is made of Low pressure fluid high strength welded pipe, welds through carbon dioxide protection according to the specific shape welding becomes.

4. Cuplock scaffolding system is upright metal scaffolding system which the height is no limit. You can add the vertical tube one by one until touch the target height of building.

5. Suitable specially for high-rise construction project constructions and so on the construction indoor and outdoor scaffold, bridge, multi-level crossing bridge, tunnel, subway, also may take the mechanical and electrical installment, the paint whitewash, the equipment service, theadvertisement manufacture activity working platform or roof system

Steel Cuplock Scaffolding System for Concrete Building Construction (Made in Guangzhou) (CS2500)
Steel Cuplock Scaffolding System for Concrete Building Construction (Made in Guangzhou) (CS2500)Steel Cuplock Scaffolding System for Concrete Building Construction (Made in Guangzhou) (CS2500)
NameSteel Cuplock Scaffolding System
Place of OriginGuangzhou, China
BrandAJ

Size

(more customized size available)
 
Standard(mm)Ledger(mm)DiameterThickness(mm)
30002500482.75/3/3.2
25001800482.75/3/3.2
20001200482.75/3/3.2
1500900482.75/3/3.2
1000600482.75/3/3.2
MaterialQ235 carbon steel
Surface treatmentHot Dip Galvanized(HDG); cold galvanized; powder coated; dip painted
ColorOrange, dark red, blue, or as you required
Welding techniqueCO2 arc Welding
CertificationSGS;EN12810
MOQ (Minimum Order Quantity)1 20ft container
PaymentT/T
Delivery time20days after deposit
PackageWithout outer packing or as you required
Production capacity100 tons for each day
Factory AddressAi De Li Road, Nan an Villlage, Xintang Town, Zengcheng, Guangzhou, China(Call us if need address in Chinese)
Tel/Fax  86-020-32897881     86-020-32897881  

Send your message to this supplier

*From:
*To:
avatar Ms. Linda
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now