Gold Member Since 2011
Audited Supplier
Guangzhou Safety Scaffolding Co., Ltd.

Scaffolding Clip, Scaffold Clip, Scaffolding Coupler manufacturer / supplier in China, offering En74 Scaffolding Clip, Made in Guangzhou, Scaffolding Accessory - U-Head, Light Duty Steel Frame System Scaffolding for Construction, Guangzhou Manufacturer (HF1930) and so on.

(/ )

Supplier Homepage Product Scaffolding Coupler En74 Scaffolding Clip, Made in Guangzhou

En74 Scaffolding Clip, Made in Guangzhou

FOB Price: US $0.5 / Piece
Min. Order: 100 Pieces
Min. Order FOB Price
100 Pieces US $0.5/ Piece
Get Latest Price
Production Capacity: 20000tons Per Month
Transport Package: Suitable for Shippment
Payment Terms: L/C, T/T, D/P, Money Gram, Western Union, cash

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: SP
  • Flexible or Rigid: Flexible
  • Standard: Standard
  • Couplers Type: Cast; Forged; Press
  • Overall Size: 48.3*48.3/48.6*48.6mm
  • Color: Silver or Red
  • Scaffolding Part Type: Scaffolding Couplers
  • Specification: BS1139, ISO9001: 2000, EN74 Class A & B, CE, SGS
  • HS Code: 730840000
  • Connection: Welding
  • Material: Carbon Steel
  • Apllication: Connect The Steel Tube
  • Surface: Galvanized/ Painted
  • Weight: 0.58-0.9kg
  • Certification: BS1139, ISO9001:2000, En74 Class a& SGS
  • Trademark: A&J
  • Origin: China
Product Description
Building Material Of Scafolding Clip(Guangzhou Manufacturer)

British type pressed and froged swivel scafold clip
1: MateriaL; Q235, 45#steel
2: Size: 48.3mm*48.3mm
3: Surface finish: Electro galvanzied. EG...HDG
4: British swivel coupler: 1.05kg/0.85kg
5: British right angle coupelr: 1.15kg/1.0kg
6: Standard: BS1139, EN74
7: Package: 25pcs/bag, steel pallet
8: Manufactuer as per customer requirem

Function of the scafolding clip
1. Fixed Scafolding Clip is used to connect the steel pipe at 90 degree.
2. Swivel Scafolding Clip is used to connect the steel pipe at 360 degree.
3. Sleeve Scafolding Clip is used to connect the steel pipe at 180 degree.

Nomally, 1000sqm of outside wall need 13tons of steel pipe. One ton of pipe will need 200pcs of the above threes to build up.

The Percentage of quantity for each coupler is below:
Fixed Scafolding Clip: Swivel Scafolding Clip: Connecting Scafolding Clip=7: 1: 2
Package       Details
Clip20GPPKG
Forged Double Scafolding Clip25000pcs25PCS/bag
Forged Swivel Scafolding Clip22000pcs25PCS/bag
Sleeve scafolding clip20000pcs25PCS/bag
Beam clamp15000pcs10PCS/bag
Putlog coupler36000pcs30PCS/bag
Board coupler36000pcs30PCS/bag
Press Fix Scafolding Clip40000pcs30pcs/box
Press Swivel Scafolding Clip40000pcs30pcs/box
Casting fixed Scafolding Clip28000pcs25PCS/bag
Casting swivel Scafolding Clip28000pcs25PCS/bag

Send your message to this supplier
Avatar
Ms. Linda
Salesmanager
*From:
To: Ms. Linda
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now