Gold Member Since 2011
Audited Supplier
Guangzhou Safety Scaffolding Co., Ltd.

Scaffolding, Cuplock Scaffolding, Cup Lock Scaffolding manufacturer / supplier in China, offering Heavy Duty Cup Lock Scaffolding for Building Construction, Galvanized Steel Cuplock Scaffold, Guangzhou Manufacturer, Hot DIP Painted Steel Cuplock Scaffold, Guangzhou Manufacturer and so on.

(/ )

Supplier Homepage Product Cuplock Scaffolding Heavy Duty Cup Lock Scaffolding for Building Construction

Heavy Duty Cup Lock Scaffolding for Building Construction

FOB Price: Get Latest Price
Min. Order: 10 Sets
Production Capacity: 2000tons Per Month
Transport Package: Cuplock Scaffoldings Are Loading in Container
Payment Terms: T/T, D/P, Paypal, Money Gram, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: cup lock scaffolding
  • Type: Scaffold
  • Supporting Mode: Projecting Scaffolding
  • Scaffolding Part Type: Scaffolding Cuplock
  • Specification: 2500*48*3mm, En12810
  • Technique: CO2 Arc Welded
  • Working Expectancy: 3-6years
  • Certification: SGS
  • Handle Material: Stainless Steel
  • Origin: Guangzhou, China
  • Material: Q235 Steel
  • Framework: Combined Scaffolding
  • Lapping Form: Full Scaffolding
  • Color: Silk, Orange, Blue
  • Surface Treatment: DIP Painted, Galvanized
  • Working Height: 2.5m/Set
  • Loading Capacity: 500kg/Set
  • Application: for Interior and Exterior Building Construction
  • Trademark: AJ Scaffolding System
  • HS Code: 7308400000
Product Description
Heavy Duty Steel Cup lock Scaffolding for Building Construction(CS2500), China Supplier


Function of Steel Cup lock Scaffolding:

1. Cup lock Scaffolding is a kind of heavy duty scaffolding system with high bearing capacity.
2. A fixed bottom cup and a movable top cup can clamp ledger end securely and quickly.
3. Cuplock scaffolding system is mainly used to building bridge project, supporting concrete walls, slab beams and temporary formworks in side building.


Structure of Steel Cup lock Scaffolding:

1. Cup lock scaffolding include standard, ledger, up cup, bottom cup and ledger blade.
2. One standard is welded a up cup and a bottom cup every 600mm to join ledgers at different heights.
3. One ledger is welded a ledger blade on both ends.
4. A sleeve base is welded at the bottom of standard to ensure stability on uneven ground and also use as the connector for the standard to connect together and get higher for both inside and outside the building.


Features of Steel Cup lock Scaffolding:

1. Fast speed of installation, simple structure
2. High strength and durability
3. Longer working life
4. Low maintainance and easy transportation
5. Flexibility in use.
6. Modular scaffolding system
7. High loading capacity scaffolding
8. Durable and safe falsework for construction
9. No loose components.
10. Multi-functional in use.

Description of Steel Cup lock Scaffolding:

1. High strength welded cup lock scaffolding system is Q235 steel tubular scaffolding which can bear about 16 tons per set.

2. The surface of cup lock vertical and horizontal are full hot dip galvanized which is an efficient method to prevent rustiness and corrosion.

3. This steel scaffolding system is made of steel tube, cups and blades, which are precision drop forged.

4. The cups with gears can prevent the ledgers moving so that the whole system are stable without shaking

5. Verticals and horizontals can be combined at many angles in horizontal level so that cuplock is perfect for arc shape building construction.
Name Cup lock Scaffolding
Place of Origin Guangzhou, China
Brand AJ

Size

(more customized size available)
 
Standard(mm) Ledger(mm) Diameter Thickness(mm)
3000 2500 48 2.75/3/3.2
2500 1800 48 2.75/3/3.2
2000 1200 48 2.75/3/3.2
1500 900 48 2.75/3/3.2
1000 600 48 2.75/3/3.2
Material Q235 carbon steel
Surface treatment Hot Dip Galvanized(HDG); cold galvanized; powder coated; dip painted
Color Orange, dark red, blue, or as you required
Welding technique CO2 arc Welding
Certification SGS;EN12810
MOQ (Minimum Order Quantity) 1 20ft container
Payment T/T
Delivery time 20days after deposit
Package Without outer packing or as you required
Production capacity 100 tons for each day
Factory Address Ai De Li Road, Nan an Villlage, Xintang Town, Zengcheng, Guangzhou, China(Call us if need address in Chinese)
Send your message to this supplier
Avatar
Ms. Linda
Salesmanager
*From:
To: Ms. Linda
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now